Installation
Zero-impact anchoring
Stations are anchored with geotechnical screw foundations — no concrete, no digging for cables. The whole installation is fully reversible and leaves no trace on the soil.
Steps
- Choose paired locations: one under the panels (test zone), one in the open field (control zone).
- Fix the station to its screw foundation and level it.
- Install the soil probe at 30–40 cm depth, horizontally.
- Power on — the station is 100% solar powered and connects automatically.
Self-install or on-site
You can install the stations yourself following our guides, or request our technicians on site.